Delivering Reliable Connectivity
Through Maritime Excellence
Our cable-laying vessels are highly specialized maritime assets engineered to install, maintain, and repair undersea cable networks with precision and reliability.
Solutions
Post-Lay Inspection & Burial (PLIB)
The PLIB operation follows cable installation and involves detailed inspection of the laid cable using ROVs to verify proper placement.
Pre-Lay Grapnel Run (PLGR)
The PLGR operation is performed prior to main lay activities to clear the cable route of small debris, fishing gear, or other obstacles.
Route Clearances
Route Clearance ensures the planned cable route is free from debris, obstructions, or existing abandoned materials that may hinder cable laying.